Civic Construction, Florida , Project Manager.

Barcelona Condominiums (2217 NW 7th Street, Miami, FL) which is a twelve (12) story building with seventy two (72) affordable apartments and a total of 175,000sf and was a $10 million project.
As senior project manager, Mr. Barata was responsible for the building construction, building schedule, cost analysis and control, and risk analysis. Mr. Barata verified and ensured that fundamental building elements and systems are designed, installed and calibrated to operate as intended. Mr. Barata supervised and served as a Technical Manager and Project Manager and managed work of sub-consultants.
Mr. Barata was responsible for reporting and preparing Scopes of Work (SOW) by determining level of efforts and labor rates. This work also included travel costs, reproduction costs, subcontractor costs (survey, geotechnical, etc.). This includes solving project problems and working with various clients.

Mr. Barata performed quality control analysis on the projects relating to technical aspects, constructability (can the project be constructed with minimal change orders), bid-ability (will all contractors bidding on a set of plans and specifications make the same assumptions to give an apples-to-apples bid comparison), and economics (value engineering).

1 comment:

Anonymous said...

Hi Johann,

I'm CEO of P4P Energy and would love to discuss a project with you. I can be reached at Steven.conger@p4penergy.com. 970-309-1405. I look forward to your call.

Regards,

Steven Conger